CABLE LAYING WORK FOR FAILED CABLES.

MEESL Is committed to overseeing the Designing, Maintaining, Implementing, or Improving electrical instruments, Facilities, components and products for industrial, commercial or domestic purposes.

HVAC MAINTENANCE WORK AT GTP CONTROL ROOM, TOTAL ENERGIES, PH.

REPLACING THE ELECTRICAL EVAPORATOR CARD.

Our Team of Experts successfully carried out maintenance Job on the HVAC facilities.

SCOPE:

  • Block Drainage was freed and a new drainage outlet was fabricated.
  • Replacement of faulty evaporator electrical card.
  • Replacement of faulty evaporator fan motor.
  • Leaking section of a Condenser in one of the unit was brazed successfully
  • Condenser with low gas was charged with R22 & R407 according to specifications.

HVAC FABRICATION PROCESS.

EDIKAN 48V AND 12V CHARGERS INSTALLATION, TESTING AND COMMISSIONING

PICTURES OF PROJECT

Interior view of Old 12V battery bank and charger

DURING

Lifting Of 48V charger

Disconnection of 12V and 48V batteries

Assembling parts of the 48V charger and battery bank on fabricated support

AFTER

Completely Installed 12V & 48V charger and battery bank.